Bathrooms · Kitchens · Flooring · Painting — Dallas–Fort Worth[email protected](214) 713-8540
LegacyHome Solutions

Flooring Installation

Flooring Installation in Dallas, Starting With the Slab

Most floor problems start underneath: a slab that is not flat, moisture nobody tested for, or no room left for the floor to move. We sort out the base first, then install the floor.

Open floor plan with new light oak luxury vinyl plank running from the entry to the kitchen

In short

Flooring installation means removing the old floor, checking and preparing the slab or subfloor, and installing luxury vinyl plank, laminate, hardwood or tile with the right underlayment, transitions and trim. It is for Dallas–Fort Worth homeowners replacing worn carpet, mismatched rooms or a floor that has started to gap, crack or squeak.

What the work includes

01

Old floor removal

Carpet, pad, tack strip, vinyl, laminate or tile removed and hauled away, with thinset and adhesive ground down so nothing telegraphs through the new floor.

02

Slab and subfloor prep

Checking flatness with a straightedge, grinding high spots, filling low spots with leveling compound and testing concrete moisture before wood or wood-based products.

03

Luxury vinyl and laminate

Floating click-lock floors with the correct underlayment, expansion gaps at walls and cabinets, and transitions planned where rooms meet or directions change.

04

Hardwood flooring

Engineered or solid hardwood, acclimated in the home before installation, glued down or floated on slabs or nailed over a wood subfloor.

05

Porcelain and ceramic tile

Tile set on a prepared base with an uncoupling membrane where needed, laid out from the room's center lines so cuts land evenly at the walls.

06

Trim, stairs and transitions

Baseboard or quarter round reinstalled or replaced, stair treads and nosings fitted, and thresholds matched to the heights of adjoining floors.

Why prep decides how a floor performs

Most houses in Dallas–Fort Worth sit on concrete slabs, and North Texas clay soil moves as it wets and dries. Slabs end up with humps, dips and hairline cracks that nobody notices under carpet. Put a rigid click-lock plank or a large porcelain tile over that, and the floor will flex, click, crack or open at the joints.

So every flooring job starts with a straightedge and a moisture test, not a box of flooring. High spots get ground down. Low spots get filled with self-leveling compound. Old thinset and glue are removed rather than covered. Manufacturers publish flatness tolerances for their products, and staying inside them is what keeps the floor quiet underfoot and the product warranty intact.

Comparing the main floor types

There is no single best floor. The right one depends on the room, who walks on it and what you want from it in ten years. Here is how the options we install compare.

Floor typeBest roomsWater toleranceThings to weigh
Luxury vinyl plankLiving areas, kitchens, kids' rooms, rentalsHigh; most rigid-core products resist spillsQuiet and forgiving; cannot be refinished, and quality varies a lot by wear layer and core
LaminateBedrooms, living rooms, officesModerate; newer lines resist surface waterHard, scratch-resistant surface; standing water at seams can swell the core
Engineered hardwoodMain living areas, bedrooms, on slabsLow to moderateReal wood top layer; more stable than solid wood on concrete; limited refinishing
Solid hardwoodHomes with wood subfloors, formal roomsLowCan be sanded and refinished many times; needs a nailable subfloor, not bare slab
Porcelain tileBathrooms, laundry, entries, kitchensVery highHardest wearing; cold and hard underfoot, and needs the flattest base of all

Matching the floor to the house

For open plans where the kitchen, dining and living areas run together, a single continuous floor looks calmer and avoids thresholds. That usually means a plank floor, and the choice is between vinyl for toughness and water tolerance or wood for character. Our luxury vinyl plank installation page explains what separates a good product from a cheap one.

If you want a floor that can be sanded and refinished years from now, wood is the only option on this list. The engineered and solid hardwood page covers acclimation, slab moisture and installation methods. For wet rooms and entries, porcelain and ceramic floor tile remains the most durable choice.

Laminate sits between vinyl and wood. It has a hard, scratch-resistant wear surface that suits bedrooms, offices and busy living rooms, as long as it stays out of rooms where water can stand on the floor. It also holds up well under rolling office chairs, where softer vinyl can dent over time.

What shapes the cost and the schedule

The flooring material is only part of the estimate. Tear-out of old tile is far more work than pulling carpet. Slab leveling can range from a few patches to a full pour of compound. Stairs take much longer per square foot than open rooms. Moving furniture, removing and resetting toilets, and undercutting door casings all add time.

We walk the rooms with you, check the slab in a few spots, and give you a written estimate that separates prep from installation so you can see where the labor goes. During the job, furniture paths and adjoining rooms are protected, dust is controlled and the house is cleaned at the end of each day.

From our projects

See all projects
Open dining and living area with continuous wood-look plank flooring
Two-story living room with wood-look plank flooring and fresh neutral paint
Living room with dark wood-look flooring and soft neutral walls
Bedroom with wood-look plank flooring, tall windows and a black chandelier

On site

How a flooring installation project runs

  1. Clear and remove

    Furniture is moved, adjoining rooms are protected, and the old flooring, pad, tack strip or tile comes up down to the bare slab or subfloor.

  2. Test and level

    The slab is checked for flatness and moisture, high spots are ground, low spots are leveled, and cracks are treated before any underlayment goes down.

  3. Lay out and install

    Starting lines are set so rows run straight and cuts balance at walls, then the floor is installed with expansion gaps and proper underlayment.

  4. Trim and transitions

    Baseboards, quarter round, stair nosings and thresholds are fitted, doors are checked for clearance, and the rooms are cleaned and walked with you.

The full process, start to finish

Homeowners on Legacy

From our Google reviews

4.927 Google reviews
Legacy Home Solutions did a fantastic job on our pre move in remodel. They replaced all the flooring, replaced all the baseboards, remodeled the master shower, and painted the whole place. And the had to delay their start day by 2 days due to our closing being delayed. Sebastian was on site daily. He is always thinking ahead to make sure everything went smoothly. We would definitely use them again.
Yvonne HylandGoogle review
We had a very good experience working with Sebastian and his crew. Our kitchen remodel project went very smooth and finished in a timely manner. We updated our kitchen floor tiles, installed Quartz countertops and backsplash and under cabinet lights. We highly recommend and will definitely use Legacy Home Solutions for any future projects.
Nidhi RGoogle review
Sebastian and his team did a great job making repairs to our home after having a leak. He was very transparent about timing, pricing, and always making great suggestions. They replaced all of the flooring in our bedroom and bathroom, built a brand new vanity, and made a few upgrades to the bar area! Will definitely be using them again in the future!
Hallie PattonGoogle review

Read all reviewsSee them on Google

Questions

Flooring Installation: common questions

Something not covered here? Call (214) 713-8540.

Can new flooring go over my existing tile?

Sometimes, if the old tile is solidly bonded, flat and the added height works with doors, appliances and adjoining rooms. Loose or cracked tile, hollow spots or a big height change at a threshold rule it out. In many homes the cleaner answer is removal, which also lets us fix slab problems the tile was hiding.

Do I need to empty the rooms before installation day?

Small items, decor, electronics and anything fragile should be packed away, and closets being floored need to be emptied. Larger furniture can often be moved room to room as work progresses, and we will agree on that plan beforehand. Pianos, safes and very heavy pieces usually need a specialist mover.

Why does new flooring need a gap at the walls?

Wood, laminate and many vinyl products expand and contract with temperature and humidity. A small gap at walls, cabinets and fixed objects lets the floor move without buckling or pulling apart. Baseboard or quarter round covers the gap, which is why trim is part of every floor installation, not an afterthought.

Should the same floor run through the whole house?

In open living areas, one continuous floor usually looks best and avoids trip edges. Bathrooms and laundry rooms often get tile for water resistance, and some people prefer carpet in bedrooms. The goal is fewer, deliberate changes at doorways rather than a different floor in every room.

How do you handle doors and cabinets when the floor height changes?

Door casings are undercut so the new floor slides beneath them, and interior doors are trimmed if they drag. Appliances such as dishwashers need to fit under the counter with the new floor height, so we check that before choosing thickness. Thresholds and reducers handle any remaining difference between rooms.

Free estimate

Tell us about the room. We will tell you what it takes.

A free visit, honest options and a written estimate you can hold us to.

CallFree estimate